Experimental Study on Combined Load of Ultrahigh Pressure Non-Standard Flange at Fracturing Wellhead

Bolted flange structure is the most common connection form of petrochemical equipment.The design pressure of non-standard flange for oil and gas well fracturing has reached 140 MPa,but due to operating conditions and assembly requirements,the flange also receives large end tension and bending moment...

Whakaahuatanga katoa

I tiakina i:
Ngā taipitopito rārangi puna kōrero
Ngā kaituhi matua: Li Longfei, Li Meiqiu, Jiang Yuhu, Wei Chao, Li ning, Wen Zhixiong
Hōputu: Tuhinga
Reo:Hainamana
I whakaputaina: Editorial Office of China Petroleum Machinery 2022-01-01
Rangatū:Shiyou jixie
Ngā marau:
Urunga tuihono:http://www.syjxzz.com.cn/thesisDetails#10.16082/j.cnki.issn.1001-4578.2022.10.012
Ngā Tūtohu: Tāpirihia he Tūtohu
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!