Economics of a 75-MW(e) hot-dry-rock geothermal power station based upon the design of the Phase II reservoir at Fenton Hill

Based upon EE-2 and EE-3 drilling costs and the proposed Fenton Hill Phase II reservoir conditions the break-even cost of producing electricity is 4.4 cents per kWh at the bus bar. This cost is based upon a 9-well, 12-reservoir hot dry rock (HDR) system producing 75 MW(e) for 10 yr with only 20% dra...

Full description

Saved in:
Bibliographic Details
Main Author: H.D. Murphy
Other Authors: R. Drake, Jefferson William Tester, George A. Zyvoloski
Format: Report
Language:English
Published: 1982
Subjects:
Online Access:https://www.osti.gov/biblio/5641381
https://doi.org/10.2172/5641381