Fast algorithm of borehole correction library construction for multi-component array induction tool in deviated boreholes
The construction of a borehole correction library for the multi-component array induction tool in deviated boreholes involves extensive 3D forward modeling and typically requires significant computational resources. To address this challenge, this paper proposes an efficient algorithm for the librar...
Gespeichert in:
| Veröffentlicht in: | Petroleum Science |
|---|---|
| Hauptverfasser: | , , , , |
| Format: | Artikel |
| Sprache: | Englisch |
| Veröffentlicht: |
Elsevier BV
2025
|
| Schlagworte: | |
| Online-Zugang: | https://doi.org/10.1016/j.petsci.2025.10.022 |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|